Long-context inference ultimately runs in physical infrastructure. Adding dense GPU capacity requires power, cooling, space and network paths that can sustain the workload.
Nxera’s 9 February 2026 opening announcement reports 58 MW of AI-ready capacity at DC Tuas, bringing its total Singapore data-centre capacity to 120 MW. The announcement describes direct-to-chip liquid cooling, integration with a cable landing station and a power usage effectiveness (PUE) of 1.25. [3]
For sensitive workloads, capacity planning must also account for where models, data and cached state are processed and retained, alongside who has access to them.
PUE compares total facility energy with the energy used by IT equipment. The published facility figure is not a per-workload efficiency result or a guarantee of available RE:AI capacity. Confirm the power allocation, cooling provision and expansion headroom for the proposed deployment.
The same announcement describes expansion in Batam and Johor. [3] That regional reach matters when applications, data and users span markets, but each deployment still needs an agreed location and measured network path. Physical capacity and connectivity make scaling possible; the workload test establishes how much useful inference that capacity delivers.